Standard construction, efficient implementation, emergency support
Greenhouse Engineering Construction
Greenhouse construction is the core link in transforming a design scheme into a physical project, directly determining the safety of the greenhouse structure, the stability of system operation, and the efficiency of project commissioning.
We have a professional engineering construction team, international construction standards, and a full-process on-site control system. We undertake various greenhouse construction projects worldwide, providing one-stop implementation from site entry to final acceptance. We strictly control construction quality, schedule, and safety to ensure efficient, compliant, and stable delivery of greenhouse projects.
Why is Professional Greenhouse Construction the Key to Project Implementation?
We adhere to standardized construction, refined installation, full process control, and improved emergency response to ensure the quality and delivery efficiency of greenhouse projects from the construction stage.
The Entire Process of Standardized Greenhouse Construction
• On-site investigation and review: verify the site size, terrain, water and electricity supporting facilities, and confirm the construction conditions.
• Construction plan disclosure: Communicate drawings, procedures, construction period, and safety requirements to the construction team.
• Material incoming inspection: Verify the specifications and quantities of construction materials, and complete on-site stacking planning.
• On-site fencing and safety arrangements: Establish construction protection zones, and install safety warning signs and protective equipment.
• Leveling and compaction of the site: clear the site, leveling the ground, and ensuring the bearing capacity of the foundation.
• Basic positioning and laying out: Accurately mark the positions of columns and foundations according to the design drawings.
• Foundation pouring and embedded parts installation: Complete the construction of concrete foundation and embedded parts, and maintain them to meet the standards.
• Basic acceptance: Check the levelness and strength of the foundation, and enter the main construction after passing the inspection.
• Column installation: Accurately fix the column, calibrate the verticality and spacing.
• Installation of trusses/arch beams: Install the top load-bearing structure to ensure uniform overall stress distribution.
• Installation of gutters: Implement a proper drainage design, seal the joints, and prevent leakage.
• Main structure fastening: Tighten all node bolts to complete the calibration and acceptance of the main frame.
• Installation of covering materials: fix the film/PC sheet/glass, and perform sealing and edge pressing treatment.
• Installation of doors, windows and vents: Install top windows, side windows, and access doors.
• Installation of insect screens and shading systems: Lay insect screens and install internal/external shading frames.
• Ventilation and cooling system: Install fans, wet curtaim, and circulating fans.
• Temperature control system: install heating equipment and temperature control sensors.
• Water and fertilizer irrigation system: Lay pipelines and install drip/sprinkler irrigation equipment.
• Electrical control system: Lay wiring, install the main control box, and connect sensors.
• Single-system operation test: Test and commission ventilation, temperature control, irrigation and shading equipment one by one.
• System-wide linkage debugging: Test the intelligent control linkage to ensure coordinated operation of all equipment.
• Troubleshooting and optimization: Rectify installation deviations and optimize system operating parameters.
• Internal comprehensive self-inspection: Test all indicators including structure, sealing, systems, safety, etc.
• Cooperate with the client/third party for acceptance: Provide construction documents and accompany on-site acceptance.
• Delivery of completion documents: Submit construction reports, acceptance reports, and equipment usage instructions.
In response to issues such as remote project locations, insufficient local construction resources, and inconsistent standards for global overseas clients, our flexible construction model fully supports the implementation of cross-border projects.
Mode 1
• We will dispatch a certified professional installation team overseas, responsible for the entire process of greenhouse foundation verification, main structure installation, system assembly, and commissioning.
• The team comes with standardized construction tools and testing equipment, and operates strictly in accordance with international standards.
• Responsible for construction control, safety management, and progress monitoring throughout the entire process, ensuring the greenhouse is ready for operation upon delivery.
• Provide cross-border construction qualifications, assist with exit formalities, and coordinate local construction compliance docking.
Mode 2
•We will dispatch senior technical engineers to provide full-process on-site guidance to the client's local construction team.
•Provide construction drawing clarification, installation process training, dimension calibration, and system commissioning guidance.
•Resolve on-site construction challenges, control installation accuracy, and mitigate construction risks.
•Provide simultaneous guidance on construction sequence planning, safety specifications, and acceptance criteria.
Whether you need a full-time overseas installation team or on-site guidance from technical engineers, we can customize a solution based on your overseas project conditions, strictly control quality, schedule and safety, and help your greenhouse project land efficiently and compliantly.
For common unexpected issues at construction sites, we have established a rapid response, advance prediction,and special handling mechanism to maximize construction safety and schedule assurance.